Furniture that will not fit up the stairs: who checks first?

It happens with the piece finished, the lorry in the street and the room ready: the furniture is right, the room is right, and in between there is a landing.

In short. A bespoke piece is measured twice: against the room it will stand in, and against the route it has to travel to get there. The second measurement is almost always forgotten, and its absence comes to light once the piece has been built, which is when nothing can be done about it. The access route is surveyed before cutting, written into the order and, where it is tight, it decides how the piece is built. Not the other way round.

Why the problem is not the furniture, it is the route

The piece is made to the dimensions of the room, and the room is reachable: you can walk into it. Between the lorry and the room, though, there is a sequence of constrictions, and any one of them can be the one that stops everything — the narrowest is hardly ever the bedroom door.

Set out in order, the route is this: where the lorry can stand and how far that is from the entrance; threshold, main door, courtyard and any ramp; the entrance lobby, which often has two sets of leaves in sequence and neither opens fully; the stairwell, measured as the usable width between handrail and wall rather than the width of the tread; the headroom under the flight above; the shape of the landing; the lift, with the clear width of its door, the dimensions of the car and its capacity; the bedroom door and the way it swings; the corners of the corridor. Of all of these, the dimensions that actually stop pieces are almost always the three least looked at: the headroom over the landing, the room needed to turn, and the clear width of the lift door.

What counts is the clear opening, not the drawn dimension

A door marked nine hundred does not give nine hundred millimetres of passage: frame, open leaf, stop and handle take part of it, and how much depends on how it was fitted. A handrail takes width out of a stairwell along its whole height — exactly where an upright wardrobe passes. A lift door is nearly always narrower than the car it serves.

The drawing says how wide a door is; the site says how wide that door is today, with the finishes in place, and it is the second number that counts — the same reason pieces that touch the wall are not made to drawn dimensions, as in the <a href="/en/guides/hotel-furniture-site-measurements">guide on site measurements</a>.

Turning: the space that decides almost everything

A piece does not cross a building in a straight line: on the landing it turns, and turning does not call for its width, it calls for the space it sweeps while it rotates. Two stairwells of identical width behave in opposite ways depending on the shape of the landing: where the flights run parallel, less gets through than where they turn at right angles.

Then there is a distinction that looks minor and is not: between pieces that can be tilted and pieces that cannot. A mattress or an upholstered piece is turned on its side and passes a clear opening narrower than its own width, because the section it presents changes. The carcass of a wardrobe with its back fitted does not change section: it is rigid in both directions, and what will not go through standing will not go through lying down either. Which is why the right question to put to the maker is not «how big is it» but «how does it move».

When it is measured: before cutting

There are two useful moments. At quotation stage a sketch is enough, with the dimensions taken where the passage is plainly critical: it tells you whether a piece can be a single volume or has to be conceived in sections, and that is a decision about design, not about logistics. The second is the definitive survey, before cutting, with the finishes in place. After that, surveying the route serves to organise the lift, not to change the piece: the survey costs an hour on site, a remade headboard costs a production run, and in a hotel project that time is not recovered — when to order so the dates hold is in the <a href="/en/guides/hotel-ffe-lead-time">guide on lead times</a>.

Pieces designed to get through

Here is the part that belongs to whoever makes the furniture, and it is settled at the drawing board. A wardrobe can be conceived as separate elements closed up in place; a full-wall headboard can be two or three panels, with the joint where the eye does not look for it; a counter can be divided into runs on the module of its front, so the joint falls on a line that is already there; a sofa can have a demountable back and screw-off feet; a table can travel with the top separate from the base.

What separates these solutions from improvised dismantling is entirely the moment they are decided. A piece cut in two on site shows for ever; a piece designed as two pieces never shows, because the joint is part of the drawing, the structure is sized for that joint and the finishes close over it — the same reason a piece made of several materials has to be thought through whole from the start, as in the <a href="/en/guides/multi-material-furniture-approval">guide on multi-material furniture</a>.

And if it still will not go through?

The ways out exist, and it is worth knowing them in order of cost before you need them.

  • take off the packaging and carry the bare piece up, protected by hand: it recovers a few centimetres, and sometimes that is all it takes;
  • remove what belongs to the building and goes back: leaves off their hinges, architraves, a handrail if it is screwed. It has to be asked in advance of whoever answers for the building;
  • dismantle the piece into the parts that come apart — which exist only if somebody provided for them at the drawing stage;
  • the route outside: a hoist platform, a site goods lift, a window or a balcony. An ordinary solution and not an emergency, but it wants space in the street and almost always a permit: it is decided days ahead, not that morning;
  • rebuilding in place, which is a different operation from installation and has to be treated as such;
  • remaking the piece in sections: the last resort, and the one that costs a piece.

What does not exist is deciding with the lorry in the street: every choice taken standing on a landing is an expensive choice.

Who answers for it, and what belongs in the order

The access route is a classic grey area: the maker knows the piece, the designer the drawing, whoever runs the works the building, and none of the three has it written into their scope. Four lines in the order close it.

  • who surveys the access route, by when, and whose signature goes on the dimensions;
  • which route is assumed: lift or stairs, and on what condition — a lift provided for but not yet in service is not a route;
  • what happens if a piece does not get through: at whose cost, by what procedure, within what time;
  • who provides the external equipment on the day, if it is needed, and who obtains the permits.

It is the logic of the document signed at the end: the line is written beforehand, not on the day it is needed. What to write then is in the <a href="/en/guides/furniture-handover-report">guide on the handover report</a>; who coordinates and who answers for damage while the site is still open, in the <a href="/en/guides/furniture-installation-live-site">guide on fitting out a live site</a>.

How we work

We work to order and we follow prototyping, sampling, production and logistics inside our own manufacture, with a single point of contact from drawing to delivery: whoever draws the piece and whoever carries it up talk to each other before the piece is cut.

The part of our history that counts most here is the marine work. We have been building for boat interiors for over forty years, and there the route is not a variable: overall dimensions and passages are respected to the millimetre, which is why we work alongside the yard from the design stage, when weight and bulk are decided. A hotel staircase is a more forgiving version of the same problem. On student housing and residential supplies we deliver in phases, by lot, by floor or by block, and the route is checked lot by lot because on site it changes: a stair hoarded in March is a finished stair in September. We keep drawings and components in store, so an element that has to be remade is remade to the same dimensions, even years later.

The route of a project supply is in the contract section; the answers we give studios in writing are in questions; the work itself in the collections; and the contact details lead to the people who follow the project. In a hotel project the most valuable thing remains time: a piece that will not go up the stairs is not a joinery problem, it is a room that does not open.

Who should measure the access route?

As a rule whoever makes and installs the furniture, because they are the only ones who know which dimensions of the piece matter and how the piece moves. The dimensions do have to be confirmed by someone with standing on the state of the site at that date. Without a line in the order, surveying the route is nobody's job — which is why it goes undone.

Is the width of the door enough?

No, and that is the commonest mistake. You need the actual clear opening with frame and leaf in place, the headroom over the landing, the room to turn between the flights, and the clear width of the lift door.

Can the hotel lift be used for the installation?

It has to be checked on four counts: its capacity; the clear width of the door, nearly always narrower than the car; whether the car can be protected; and above all whether the installation is in service at that date. A lift that has been installed but not yet commissioned is not an access route.

Can a finished piece be cut to get it through?

Almost always it can, and almost never is it worth it: an unplanned cut crosses structures, frames and upholstery sized to stay whole, and the reassembly stays visible. First you weigh up the route outside and rebuilding in place.

Talk to us The contract division

This page sets out assessment criteria and working practice; it quotes no prices, no lead times and no company case studies. The practical indications have to be checked against the actual case, because they depend on the contract, the building and the project. No technical standard is cited: requirements change with the intended use of the rooms.