Standards
Care home and nursing home furniture: which fire class is required?
In an Italian care home above 25 beds, upholstery and mattresses must be Class 1 IM and unupholstered chairs Class 2. Which documents to ask for.
Guides
The questions we are asked most often by designers, general contractors and site managers, answered by the people who make the pieces. No theory: what you need to know before writing a specification or signing an order.
Standards
In an Italian care home above 25 beds, upholstery and mattresses must be Class 1 IM and unupholstered chairs Class 2. Which documents to ask for.
Standards
Class 1 IM and Crib 5 are not the same: what Italian homologation asks for, what BS 7176 asks for, and why one certificate does not replace the other.
Contract
Euroclasses do not exist for upholstered furniture: where the line runs between furnishing and construction product, and how to specify it.
Standards and documents
What a Class 1 IM approval actually certifies, which differences between certificate and delivery leave it valid, and which ones void it altogether.
Contract
Test report, homologation, declaration of conformity: which documents must arrive with hotel furniture, who signs what, and what if one is missing.
Contract
Site survey, shop drawings and tolerances: who is answerable for the dimensions of bespoke hotel furniture, and when the survey should happen.
Standards
"Fire retardant" and "contract grade" specify nothing. The four parts of a verifiable clause, with ready wordings, material by material.
Contract
A mock-up room is not a preview: once approved it becomes the standard every other room is judged against. What to decide, and what to record.
Contract
A hotel room starts at 4,000 euro: what that figure includes piece by piece, what pushes it up, and why the price differs between who makes it and who resells it.
Materials
Upholstery is tested at 12 kPa and a rub count without its pressure is not comparable; the real requirements sit in EN 14465, and swapping the fabric voids the Class 1 IM certificate.
Standards
Two different lists: Italy's 1994 hotel decree does not name pillows or bedding, while the 2015 Fire Prevention Code lists them item by item.
Contract and certification
Recovering or re-padding a certified armchair: when Italian Class 1 IM approval lapses, what may be replaced, and what the file must contain.
Standards
Which Italian rules actually apply to furniture in student housing, which reaction-to-fire class is required, and how to write the specification.
Contract
The IMO certificate does not belong to the fabric but to the cover-and-filling combination. What to ask a supplier, and why treatments expire.
Materials
Aniline, semi-aniline or protected, what “spessorata” means, and how the choice changes between home and hotel.
Contract
A hotel FF&E programme phase by phase, counted backwards from the opening date, and the three places where the time actually goes: none of them is manufacturing.
Contract
Where Italian fire regulations require it, why an approved fabric is not an approved sofa, and which documents to ask your supplier for before delivery.
Site
On a live site the fitting firm needs suitability documents, a POS and coordination by the execution coordinator; once the site is closed article 26 and the DUVRI apply.
Contract
Eight days and one year in a sale, sixty days and two years under a works contract: how the order is classified and what warranty follows.
Contract
An unreserved signature accepts the defects you can see: the twelve lines of a report that holds, and how to write a reservation.
Contract
Under Italian law the price falls due when the work is accepted. Why an advance and a payment for a portion do not carry the same weight.
Standards
Italian hotels still have two fire-safety routes. How to tell them apart in the documents, and what actually changes for the furniture.
Standards
An Italian type-approval lasts five years and lapses on any change to the product: how to read the conformity mark, and the four checks to run at order stage.
Standards
The decree sets the square metres, not the furniture, and the call does not reimburse it: minimum areas, no bunk beds, and furnishings that must appear on the drawings.
Materials
The EN ISO 12945 pilling grade measures a change, not an appearance, and three machines give grades that do not compare; the specification has it assessed at 2,000 cycles, not fifty thousand.
Standards and documents
Article 10 of the 1984 Italian decree allows furniture already installed to be classified, but it points to the same Article 8.1 stages: the laboratory time is a fresh type approval’s, so it is no shortcut. What actually differs between the routes.
Standards
On technical forums the answer is no. The 1993 circular on series type approval says otherwise: one test, many models, as long as the materials stay the same.
Standards and documents
Test report, type approval certificate and declaration of conformity are three different documents, and only one of them satisfies the hotel rule. What goes into the filing, and what stays in the dossier.
Standards and documents
Two objects with one name: the one that takes a separate mattress has two documents, the «ready» one is tested twice and takes the worse class. Plus a line you can check in ten seconds.
Standards and documents
A folder of certificates for the individual parts is not the certificate of the piece: every component is classified at its minimum thickness, and the whole item takes the worst class.
Standards
No source puts furniture accessories outside the rules. The rule about the frame not counting applies to upholstered armchairs: on a rigid chair the armrest is a constituent material.
Regulations
A rug is nowhere in the furnishing materials lists. Fixed to the floor it becomes a covering and needs a Euroclass with the fl suffix; laid loose, nothing is required.
Regulations
The 0.6 mm note applies only to non-combustible materials, and wood is not one: the finish is part of what was tested, and fire-retardant varnish is a route for linings, not for furniture.
Wood
Wood moves, and moving is not a defect: the asymmetry is. The hollow always faces the drier side, and in thirty seconds it says whether the cause is the piece or the building.
Materials
A covering that flakes away and shows a woven backing is losing an applied layer: the shape of the failure tells you what the material was, and from there who answers for it.
Site
When the site slips and production does not, there are four routes: keep the goods at the maker’s, move them to a third-party warehouse, store them on site, or slow the deliveries down into phases.
Upholstery
It can, and on a hotel project it often is. What changes is not whether it is possible but what the decision costs, and that cost turns on a single fact: how far into the work the request arrives.
Site
A bespoke piece is measured twice: against the room it will stand in, and against the route it has to travel to get there.
Upholstery
A signed sample and a delivered roll never match entirely. Where lot variation ends and non-conformity begins is settled not by the eye but by the approved sample and its date.
Site
Upholstery arrives finished. For fitted wardrobes, counters and panelling the choice does exist, and it is not made on transport: it is made on access, on the tolerances of the building and on who answers for the finished piece.
Contract
Contract furniture comes out of one particular batch of fabric, leather, wood and lacquer, and that batch runs out. Getting the same piece years later is settled on the day of the order, not on the day something breaks.
Site
A hotel wardrobe has to stand up on its own: stability is a requirement of the piece, not a merit of the wall. Anchoring is for where the instructions call for it, and it belongs in the order before installation day.
Standards
The tests that say whether a chair or a table will survive a hotel are mechanical, not fire ones. Since 11 September 2025 the standard for non-domestic seating is a new one, and what it leaves out is the part that settles arguments.